OK PLAN ARCHITECTS OKPLAN ARCHITECTS

Komorovice – Hranipex manufacturing facility

INVESTOR Hranipex a.s. Humpolec
PROJECT 2001
REALIZATION 6/2001 - 1/2002
CONTRACTOR UNISTAV a.s. Brno
Cost 55 millions Kč

Construction of a new industrial park near Humpolec. An effort was made to maintain maximum simplicity and to leave structural materials exposed without final surface treatment. The administration part of the building is closely tied to the surrounding nature. 

The interior was designed in the same spirit as the building itself, with the maximum variability and purity of all solitaire furnishings. Interior modifications involved merely emphasising the construction materials (concrete, glass, aluminium, wooden floors).

Photos Pavel Štecha